realization the movable bulkheads system save venice from |
||||||||||||||||||||||||||||||||||||||||
| navigate by keyword : adriatic anti barrier bulkhead construction crane dam embankment engineering equipment floating flood flooded high industrial industry italy marine mose platform project protection public rescue sea security ship site tide venice wall water works |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
| Venice, Italy - May 5, 2016: Construction site for the realization of the movable bulkheads system to save Venice from tides. |
||||||||||||||||||||||||||||||||||||||||
|
Stockphotos.ro (c) 2025. All stock photos are provided by Dreamstime and are copyrighted by their respective owners. |
||||||||||||||||||||||||||||||||||||||||