realization the movable bulkheads system save venice from |
||||||||||||||||||||||||||||||||||||||||
| navigate by keyword : adriatic anti barrier bulkhead construction crane dam embankment engineering equipment flood flooded high industrial industry italy marine mose platform project protection public sea security site tide venice wall water works |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
| Construction site for the realization of the movable bulkheads system to save Venice from tides. |
||||||||||||||||||||||||||||||||||||||||
|
Stockphotos.ro (c) 2025. All stock photos are provided by Dreamstime and are copyrighted by their respective owners. |
||||||||||||||||||||||||||||||||||||||||