reinforce concrete bore pile the construction site |
||||||||||||||||||||||||||||||||||||||||
| navigate by keyword : 2018 architecture auger bar beam bore bored borehole build building cap concrete construction continue cut danger debris dirt drilling driven earth earthworks engineering excavation foundation geology ground heavy hoarding hole hydraulic industrial industry install job june15 kuala level load lumpur machine machinery malaysia metal mining pile pipe power process project reinforce reinforcement rig site steel strength technology transfer transferring trenches underground well works |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
| KUALA LUMPUR, MALAYSIA -JUNE 15, 2018: Reinforce concrete bore pile at the construction site. Cut to level to continue with pile cap and ground beam works. Transferring load from building to earth. |
||||||||||||||||||||||||||||||||||||||||
|
Stockphotos.ro (c) 2026. All stock photos are provided by Dreamstime and are copyrighted by their respective owners. |
||||||||||||||||||||||||||||||||||||||||