the process replacing cold and hot water meter due failure flow control device close old equipment |
||||||||||||||||||||||||||||||||||||||||
| navigate by keyword : 2020 attach brass close cold construction consumption control counter device drop due engineer engineering equipment failure fitting flow flowing gauge gloves green hot idea industry instrument july life measurement mechanical metal meter old part petersburg pipe piping plastic problem process red register repair replacing running russia rusty saint sanitary sewer sewerage shower stain still system tap tile tubing valve water wet white wrench |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
| Saint Petersburg, Russia - July 30, 2020: The process of replacing the cold and hot water meter due to the failure of the flow control device. Close-up of old equipment |
||||||||||||||||||||||||||||||||||||||||
|
Stockphotos.ro (c) 2025. All stock photos are provided by Dreamstime and are copyrighted by their respective owners. |
||||||||||||||||||||||||||||||||||||||||