the process cutting piles after completion building foundation piling work |
||||||||||||||||||||||||||||||||||||||||
| navigate by keyword : 2021 activity bore borehole build building buildings cap carried casting compacting completion concrete construction cut cutting dig done dredger drill drilling driven earth earthworks engineering excavation fabricate form foundation geology ground heavy industrial industry install job level load machine machinery malaysia material needs penang pile piles piling power process project reinforcement rig september site steel strong structure this transfer well work worker |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
| PENANG, MALAYSIA -SEPTEMBER 2, 2021: The process of cutting piles after the completion of building foundation piling work. This work needs to be done before the construction of the cap pile is carried out. |
||||||||||||||||||||||||||||||||||||||||
|
Stockphotos.ro (c) 2025. All stock photos are provided by Dreamstime and are copyrighted by their respective owners. |
||||||||||||||||||||||||||||||||||||||||