order preserve the gravel road between villages when was repaired concrete pipes were laid under for flow |
||||||||||||||||||||||||||||||||||||||||
| navigate by keyword : soil asphalt waterway wall sand terrain construction rock coast infrastructure vehicle transport ruins wadi track badlands order preserve gravel road villages repaired concrete pipes laid under flow spring rain water from hilly field plots lowland agricultural land culverts dirt side dirty ditch drain systems drainage engineering environment excavation works fields grass ground hole industrial industry meltwater municipal nature pipe pipeline were pit rainwater reconstruction repair work roadway sewage sewerage trench tube underground vegetation village |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
| In order to preserve the gravel road between the villages when it was repaired, concrete pipes were laid under it for the flow of spring and rain water from the hilly field plots to the lowland |
||||||||||||||||||||||||||||||||||||||||
|
Stockphotos.ro (c) 2025. All stock photos are provided by Dreamstime and are copyrighted by their respective owners. |
||||||||||||||||||||||||||||||||||||||||