iron railway bridge being constructed |
||||||||||||||||||||||||||||||||||||||||
| navigate by keyword : strong iron bridge constructed sevok rangpo railway project srrp kalijhora kalimpong route tunnels bridges final cost estimated 121 billion landmark tower transport monument architecture arch tree ruins vehicle mast column building memorial waterway |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
| The strong iron bridge being constructed for Sevok-Rangpo Railway Project (SRRP) at Kalijhora in Kalimpong. The route is 44.96 km with 14 tunnels and 22 bridges of which final cost is estimated around Rs. 121.3 billion. |
||||||||||||||||||||||||||||||||||||||||
|
Stockphotos.ro (c) 2025. All stock photos are provided by Dreamstime and are copyrighted by their respective owners. |
||||||||||||||||||||||||||||||||||||||||