historic bridge reconstriction |
||||||||||||||||||||||||||||||||||||||||
| navigate by keyword : 1939 arrived asphalt border borderland bridge closure construction deutsches due highway historic iron landmark march metal moravia odra ostrava pet kovice protektorat reconstriction reconstruction reich river road silesia silesian state sudetenland this way wehrmacht workers working workplace |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
| Closure of the road to PetÃ
â¢kovice due reconstruction of the historic bridge over the Odra river. After this bridge the Wehrmacht arrived in Ostrava in 15 March 1939. |
||||||||||||||||||||||||||||||||||||||||
|
Stockphotos.ro (c) 2025. All stock photos are provided by Dreamstime and are copyrighted by their respective owners. |
||||||||||||||||||||||||||||||||||||||||