construction the second metro line tunnel boring machine subway site |
||||||||||||||||||||||||||||||||||||||||
| navigate by keyword : 2018 big boring build business construction crane cutter dig digger drill drilling equipment excavator gautrain head heavy industrial industry job labor line machine machinery material mechanism metro mining modernization new open outdoor poland property renewal rock second september shield site south structure subway technology tool tunnel underground urban warsaw work |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
| Warsaw, Poland. 8 September 2018. Construction of the second metro line. Tunnel Boring Machine at subway construction site |
||||||||||||||||||||||||||||||||||||||||
|
Stockphotos.ro (c) 2026. All stock photos are provided by Dreamstime and are copyrighted by their respective owners. |
||||||||||||||||||||||||||||||||||||||||