workers are using shovels for realign excess ground correct trench measure |
||||||||||||||||||||||||||||||||||||||||
| navigate by keyword : 2018 activity adjust align alignment are base building civil construction correct correction corrects coverall customize earthwork engineering excess flatten foundation fraction gravel ground hardhat helmet hole industrial industry inside job level manpower manually march measure measures pebble people quadratic realign right rock safety sand serbia set shape shovel shovels site soil square stone surplus team teamwork tool trench using vest vojvodina waistcoat work worker workers zrenjanin |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
| Zrenjanin, Vojvodina, Serbia - March 30, 2018: Workers are using shovels to set up level foundation to right measures in square trench |
||||||||||||||||||||||||||||||||||||||||
|
Stockphotos.ro (c) 2025. All stock photos are provided by Dreamstime and are copyrighted by their respective owners. |
||||||||||||||||||||||||||||||||||||||||