munich germany jul 2015 olympic stadium |
||||||||||||||||||||||||||||||||||||||||
| navigate by keyword : adapt architects architecture behnisch building cable cables calculations computational conceptual cover design designing determine economy form frei germany gunther host lightweight mathematical munich nullified olympic otto pioneered pole preconceived procedures raised shape stadium structure supports surface system tensions widespan |
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
| The architects Günther Behnisch and Frei Otto were in charge of designing and building the stadium would host the Olympic Games in Munich 1972. They raised a lightweight structure where tensions are nullified by a system of supports and cables, allowing both economy and new way. They pioneered the use of mathematical calculations based on computational procedures to determine the shape and behavior of the surface of the cover. Otto had to adapt their design to the preconceived form above for the winner Günther Behnisch. |
||||||||||||||||||||||||||||||||||||||||
|
Stockphotos.ro (c) 2025. All stock photos are provided by Dreamstime and are copyrighted by their respective owners. |
||||||||||||||||||||||||||||||||||||||||